Technological procedure for mounting
Spike system |
Characteristics of the system |
Examples of use |
1.Surface preparation
2.Installation

Surface preparation
• The system components are to be installed only on dry and thoroughly cleaned surfaces free from pigeon droppings, grease, and dust at a temperature of 5°C or more.

Installation
The strips are to be placed parallel to the edge of the surface in a row, side by side. For the drainage of water from
the area behind the strips, a 5mm gap should be left between the individual strips.
- Mounting using a silicone glue
- - For mounting using glue, we recommend Silirub 2® neutral transparent silicone glue by Soudal®.
- - The glue must be applied on the full length of the basic strip.
- - The strip with the silicone applied is to be lightly pressed onto the surface. Then we can check whether the strip is mounted in the required position.
- - The glue sets in 24 hours. After 10 minutes the glue produces a hard shell.
- - One cartridge of the glue can be used to mount 8m to 12m of the spike system, depending on the surface material.

- Mounting using nails
- - Nails are to be used for mounting onto wooden surfaces.
- - For the nails, the holes in the basic strips are to be used.

- Mounting using wood screws
- - Screws are to be used for mounting onto wooden surfaces.
- - For the screws, the holes in the basic strips are to be used.